Recent Projects

Laterite Treatment Plant

MCE completed the Electrical and Instrumentation Construction Project for the new Laterite Treatment Plant at RIO TINTO Ranger Uranium Mine. This project included the entire E&I works for the stand alone Crusher and Mill and tie ins to the existing process plant including the HV ring main and installation of 2 substations. 

Tailings Pumping System

MCE were contracted to design, supply & install a Booster Pumping Station and Tailings system upgrade for ERA. This included all instrument/electrical installation, PLC implementation and programming, integration and programming into site DCS.

HMS Plant Installation

MCE completed the installation and commissioning of a vendor supplied modular HMS plant. This project included all instrument/electrical installation, MCC installation, variable speed drives, cable ladder system and underground cabling.

Crusher Installation

This project included the entire Electrical and instrumentation works for the stand alone Crusher and tie ins to the existing process plant. This project was carried out in a tight time frame requiring close work with the Mechanical Contracting Company.

Radiometric Treatment Plant

MCE completed the Electrical and Instrumentation Construction Project for the new Radiometric Treatment Plant at RIO TINTO Ranger Uranium Mine. This project included the entire E&I scope encompassing the High Voltage, Medium & Low Voltage, Instrumentation and Control System.

Crushing & Screening Plant Installation

MCE completed the Electrical and Instrumentation Construction Project for the new Crushing and Conveying circuits for Jaguar Metals. This project included the entire E&I works for the two stand alone Cone Crushers and tie ins to the existing process plant including the HV Installation and installation of transformer & substation.

Fiona Stanley Hospital

MCE have been engaged by Honeywell Building Services to complete the installation and commissioning of the Building Management DDC control system for the new Fiona Stanley Hospital. This project includes the supply and installation of all cabling, field devices and connection and commissioning into the Honeywell Control System.

Sports Oval Lighting

MCE were contracted for the design, supply and installation of Sports Oval lighting at 3 grounds in the City of Kalgoorlie Boulder. This project included the supply of 25 metre lowerable lighting towers and associated light fittings. All power and control cabling was installed and MCE also completed the trenching and civils.

Plant & Equipment

MCE have invested heavily in plant & equipment to ensure that projects and maintenance activities are able to be completed with minimal requirements for outsourcing of equipment.

A full complement of tooling including welders, grinders, drills, conduit bending equipment, hand tools, portable lighting, generators, compressors & Purpose built modified sea containers for mobile workshops and storage.

Plant and equipment available for use on projects undertaken by MCE.

  • Various 4WD utilities 
  • HiAce Commuter Buses
  • Dual Cab Trucks
  • Excavator
  • Trench Diggers
  • Bobcat & Dingo Diggers
  • EWP’s & Scissor Lifts

Panel Fabrication

MCE can provide switchboards, control panels including:

  • MSSB’s
  • Starter Panels
  • PLC Control Panels
  • Marshalling Panels
  • Instrument Panels

Calibration Services

MCE have a full array of Electrical and Instrumentation test equipment including Electrical Installation Testers, Electronic Communicators, Pressure & Process Calibrators, Temperature Calibrators and Vendor Software packages. This enables us to provide calibration and verification to;

  • Pressure
  • Temperature
  • Level & Flow
  • Control Devices and Valves
  • Electrical Equipment