Carosue Dam

MCE were contracted by Nomadic Energy for the installation of a five-megawatt solar installation at Northern Star’s Carosue Dam gold mine north-east of Kalgoorlie-Boulder.

The solar project has a DC capacity of 3.32 MW, which was made up of 8,100 410W panels on 90 pre-fabricated mobile arrays. The maximum AC output of the farm is 2.75 MW AC, which, in combination with the original solar farm, brings the total site penetration to 3.5 MW AC

Contact

13 Close Way, Kalgoorlie WA 6430
Phone: (08) 9021 2677
Email: admin@mcengineering.com.au

Scroll to Top